Paving of the Methanol Plantمدیر پرند2020-01-18T13:14:05+03:30 Project Description Paving of the Methanol Plant Project: Paving of the Methanol PlantClient: Boushehr Petrochemical Company Contract Amount: USD 2.3 million Start date: May 2017 Duration: 5 months Progress: 21% Project Description Related Projects Engineering, procurement, and construction, pre-commissioning, and commissioning of Tanks and non-industrial buildings (EPC1) Construction of the boiler foundations, pedestals, and installation of anchor blots – Phases 17 and 18 Construction of the main pipe rack foundations, pedestals, and installation of anchor blots – Phases 17 and 18 Construction of the boiler foundations, pedestals, and installation of anchor blots – Phases 17 and 18 Civil works, Buildings, and U/G piping works of Lorestan B1, LLDPE/ HDPE Petrochemical Complex Procurement and construction of non-industrial buildings, phases 22, 23, and 24, South Pars Gas Field Development Project Civil works and U/G piping in different areas, South Pars Gas Field Development – Phase 14 South Pars Gas Field Development Project – Phase 19